The Consent Management reporting grid is another in-depth
Pivot Grid . The main purpose of the report is to provide Administration Users with an hourly block view of vehicle
Entry versus
Exit and Movement versus
Non-movement counts.. Providing reason for the
View In (being Entry Weigh Time In) and
View Out (being Exit Weigh Time Out) Pop out function (below). The report provisions for Profit Centre versus
Profit Centre Scale counts when processing
intercompany transactions ensuring accuracy of reporting.
Grid Default and Profile Edit Settings
; integration to MS Excel accompanied with an easy ability to drag and drop fields delivers production of an Authority requested report that can be delivered in minutes and not days.
Adhering to resource consent and compliance can be a significant managerial burden to profit centre owners and operations management because firstly it has to be understood and secondly more often than not, sets out the profit centres maximum capacity constraints:
Resource Consent Problems; Solved
A. The term 'quarry truck movements' shall include all quarry related trucks and/or truck and trailer units entering or leaving the current weighbridge quarry profit centre; site).
B. There shall be no more than XXX truck movements (XX in and XX out) per hour with a total not exceeding XXX truck movements (XXX in and XXX out) per day on weekdays, Monday to Friday, being just under XX truck movements per hour averaged over XX.X hours.
C. For 30 weekdays (Monday to Friday) per year, the total daily truck movements can be increased so they do not exceed exceed a maximum of XXXX (XXX in and XXX out) and XXX truck movements per hour, provided that this does not occur more than XX weekdays in any one week.
D. On Saturdays, there shall be no more than XX truck movements (XX in and XX out) per hour between the hours of .....
E. There shall be no more than XXXX truck movements per week (Monday to Saturday) ......
F. The maximum size of any truck transporting aggregate shall be XX Tonnes (gross laden weight)
G. Measure and keep records of the quantity of material leaving the quarry on any truck .......
-
Recorded on sequential numbered dockets
-
Date and time the measurement took place
-
Weight of material being transported
H. Provide to authorities ....
-
In the form of a spreadsheet, the number of quarry trucks to and from the quarry during each hour of the previous month and;
-
Sequentially ordered copies of each docket......
-
Details of any days in the previous month when 'increased' truck movements occur in reliance on condition........
I. Subject to any specific limitation included in the conditions of any other consent granted with respect to the quarry, the hours of operation for on-site quarry operations (including extraction, operation of machinery, but excluding blasting, load out activities, maintenance works and quarry movements associated with load out activities) shall be as follows:
-
Monday to Friday x:xx a.m - x.xx p.m
-
Saturday x:xx a.m - x.xx p.m
-
Except that there shall be no removal of overburden from the quarry face during weekends and public holidays.
J. The hours of operation for maintenance activities are as follows:
K. The hours of load out activities associated with "quarry truck movements" operation shall be as follows:
L. No quarry trucks shall enter the site before x:xx a.m Monday to Friday or before x:xx a.m on Saturdays.
All resource consent limitations (above) are solved with successful setup of the,
Movement Count tab. Where resource consent is not applicable the Consent Management grid can be used to manage and better understand peak and off-peak vehicle movements which works in allocating more labour and machinery (i.e. loaders) during peak times so minimize vehicle loading, wait times. The Consent Management grid is 100% accurate needs no data extraction or manipulation in Excel offers as
standard by Hour, Day, Week, Month, Quarter and Annual break downs which can be further
dimensionalised by;
Vehicle ID,
Vehicle Configuration Docket and most importantly a simple description as to why the count is considered a Non-movement count. I.E. A Split Load. that produces two dockets resulting in one movement..